Customer Service Hotline
0731-8512 8016

This project is located in Luohu District, Shenzhen, with a total installed capacity of 0.2016MW. During the contract period, the total power generation is approximately 5.4339 million kWh, cumulative standard coal savings are about 2,173.56 tons, and total CO2 emissions reduction is roughly 5,417.61 tons.
The project fully utilizes the idle building rooftops and parking lot resources of the Luohu District Water Bureau of Shenzhen Municipality, effectively reducing building energy consumption. It is a concrete practice in actively responding to the national strategic goals of "carbon peaking and carbon neutrality," and holds significant demonstration significance for promoting the green and low-carbon development of public institutions and optimizing the regional energy structure.