On June 4, 2023, the construction technical disclosure for the distributed photovoltaic power generation project of Hunan Provincial Forestry Bureau, invested and constructed by our company, was held in the hall on the 1st floor of the office building of Hunan Provincial Forestry Bureau. The participating units in this construction disclosure were: the construction unit (Hunan Branch of China Skills Energy Group Co., Ltd.), the design unit (Hunan Dynamic Source Electric Power Survey and Design Co., Ltd.), and the construction unit (Tianren Construction and Installation Co., Ltd.).
At the meeting, the construction unit introduced the basic information of the project; the design unit elaborated on the key construction nodes and quality requirements, and answered questions for the construction unit; Liu Bin, Vice President of the construction unit, issued the construction commencement order to the construction unit and put forward requirements on safe and civilized construction.
After the construction disclosure, the group conducted another on-site survey and safety inspection on all the rooftops involved in the project. Since then, the project has officially entered the construction phase.